Phifer Field Apron Reconstruction Project

GDA provided Wheatland with this much needed project. The apron was in poor condition and was replaced for just under $800,000. The apron was connected to the runway with only one connector taxiway. GDA staff had to be creative to allow Hospital Medivac flights to have access to the runway during construction.